The short answer

Every major development in London must submit a detailed energy assessment with its planning application, showing how it will meet the London Plan's net zero-carbon target. The assessment follows the energy hierarchy: be lean (use less energy), be clean (supply energy efficiently), be green (generate renewables on site) and be seen (monitor the result). Building Regulations set the minimum, and planning policy often asks for more. Outside London, the rule depends on the local plan: see councils outside London.

Sources: The London Plan 2021, GLA Energy Assessment Guidance (June 2022)

How planning and Building Regulations differ

Building RegulationsPlanning (London Plan and local plan)
Decided byBuilding control bodyLocal planning authority, with the GLA for referable schemes
Question askedDoes the design meet the minimum legal standard?Does the scheme meet policy targets and maximise on-site savings?
TimingBefore and during constructionAt application, and by condition afterwards
Applies toAll building work in scopeUsually major development (thresholds vary)

The London Plan policies that matter

  • SI 2: Minimising greenhouse gas emissionsLegal requirement
    The energy hierarchy and the net zero-carbon target. Major proposals need a detailed energy strategy.
  • SI 3: Energy infrastructureLegal requirement
    The heating hierarchy and Heat Network Priority Areas.
  • SI 4: Managing heat riskLegal requirement
    Overheating and the cooling hierarchy.
  • T6.1: Residential parkingLegal requirement
    EV charging provision in new homes, alongside Part S.

Planning policy, not Building Regulations. Full text in The London Plan 2021, chapter 9.

What the GLA energy assessment guidance asks for

These figures are from the GLA Energy Assessment Guidance (June 2022), written for Part L 2021. The GLA has said it will update its approach once new national standards are agreed, so check for a newer edition before you rely on them.

ItemRequirementPara
On-site carbon reductionAt least 35% beyond Part L 2021, met separately for residential and non-residential parts1.7, 2.2
Residential benchmark50% or more beyond Part L 2021 expectedTable 1
Energy efficiency (be lean)At least 10% for residential and 15% for non-residential from efficiency alone1.7, 7.1
Energy use intensityReport it. Reference figure for residential is 35 kWh/m²/yrTable 4
Space heating demandReport it. Reference figure is 15 kWh/m²/yrTable 4
OverheatingShow the cooling hierarchy was followed, with passive design8.2 to 8.4
Heat networksShow connection to existing or planned networks was prioritised, with correspondence9.12, 9.13
RenewablesCommit to maximising on-site generation, including storage potential1.7
TimingSubmitted with the application, not left to a condition1.7
Outline applicationsEnergy strategy at outline, detailed assessment at reserved matters3.2, 3.6

Offsetting the remaining carbon

Any shortfall to zero carbon is bought out through a payment to the borough's carbon offset fund. Guidance has used 30 years of remaining emissions multiplied by a price per tonne, with £95 per tonne recommended. Boroughs may set their own price. A payment is accepted only once on-site savings are shown to be maximised.

Our practical advice Check your borough's current offset price before you budget.

Heating and solar in a planning application

  • In Heat Network Priority Areas, connect to an existing or planned network first. Then zero-emission or secondary heat (with a heat pump if needed), then low-emission CHP only where it enables a wider network, and ultra-low NOx gas boilers last.
  • Direct electric heating is generally not accepted.
  • Solar PV should be maximised on roofs even if the 35% target has been met.
  • "Be seen": all major developments must monitor and report energy performance after completion.
  • Whole life-cycle carbon assessments are required for referable applications.

Some of these points come from older GLA guidance, so confirm each against the current edition.

Borough policies and the Merton rule

The Merton Rule, adopted by Merton Council in 2003, was the first policy requiring a share of energy from on-site renewables. It has largely been absorbed into London Plan and borough policy, but boroughs still add their own requirements. Examples include Merton's adopted 2024 Local Plan climate policies, and a group of London boroughs working on net zero policies that use energy-use targets instead of percentage carbon savings. Read the adopted local plan for each site.

Outside London

Councils outside London set their own energy policies in their local plans, within national limits. We cover the legal powers, the national limits and real council examples on a separate page: Energy strategies: councils outside London.

How the Future Homes Standard changes things

From 2027, the Building Regulations will already require low-carbon heating and solar on new homes. Planning applicants will still be asked to follow the energy hierarchy and show maximised on-site savings, and GLA guidance is expected to move toward the new baseline.

Our practical advice Do not assume that compliance with Part L alone satisfies planning policy.

What a good energy statement contains

  • Site and scheme summary, including units, floor area and uses.
  • Baseline emissions and the method (SAP or SBEM, and the emission factors used).
  • Be lean measures and the percentage achieved.
  • Be clean: heat network opportunity and the heating hierarchy.
  • Be green: heat pump and PV design, with roof layouts.
  • Overheating and the cooling hierarchy.
  • Energy use intensity and space heating demand figures.
  • Offset calculation and any payment.
  • Be seen monitoring commitment.
  • Whole life-cycle carbon, where required.