England · London detail · Rules as of 22 Nov 2026

Know the energy rules before you break ground.

EV charging, solar, heat pumps and the Future Homes Standard. Tell us about your project and we'll list what applies, with the official source for each rule.

SOLAR PV HEAT PUMP EV
  1. 24.03.2027 Future Homes Standard comes into force
  2. 27.08.2027Solar permitted development transition ends
  3. 24.09.2027Higher-risk building work start date
  4. 24.03.2028Last day to start work on protected plots

Your result

What applies

RuleStatusWhat you needSource

A quick guide, not legal advice. "Check" means it depends on your scheme or is still being verified against the full Approved Document.

Need any of this installed? We recommend REX for EV chargers, solar PV, batteries and heat pumps. PartnerGet a quote from REX

Recommended installer Partner

Know the rules? Now get it built.

We recommend REX to install the systems this guide covers: EV chargers, solar PV, batteries and heat pumps, for developers, contractors and self-builders in London and surrounding areas.

  • EV charge points and cable routes (Part S)
  • Solar PV and batteries (Requirement L3)
  • Heat pumps for new homes and conversions
Get a quote from REX

FAQ

Common questions

Are gas boilers banned in new homes in England?

No, not by name. The energy targets are set using a notional home with a heat pump, so gas boilers will struggle to comply.

When does the Future Homes Standard apply to my site?

Plot by plot. A plot keeps the old rules only if its building control application is in before 24 March 2027 and work starts before 24 March 2028.

Do new homes need EV charge points?

Yes, where they have parking. Part S requires one charge point per associated parking space, limited by a £3,600 average connection cost per charge point.

How much solar does a new home need?

Most homes need PV equal to an array covering 40% of the ground floor area at 0.22 kWp per square metre.