The short answer
Since 15 June 2022, Part S of the Building Regulations has required EV charge points in most new buildings in England that have parking. For new homes, the rule is one charge point per parking space, limited by a £3,600 average connection cost per charge point. Spaces beyond the cap get cable routes instead. The government is consulting on extending the rules to covered car parks, with responses due by 16 December 2026.
Sources: Approved Document S, Approved Document S FAQWho and what Part S covers
Part S applies to new residential buildings, new non-residential buildings, buildings with a material change of use, buildings undergoing major renovation, and mixed-use buildings. It only applies where the building has an "associated parking space": a space used by occupants or visitors and inside the site boundary.
| Project type | Charge points | Cable routes | Notes |
|---|---|---|---|
| New home (house or flat) with parking | One per associated space, up to the £3,600 average connection cost cap | For spaces without a charge point, where the building has more than 10 spaces | Each terraced or semi-detached house is usually its own building |
| New block of flats | Same | Same, treating the whole block as one building | Shared spaces can be split pro rata by dwelling |
| New non-residential building, more than 10 spaces | At least one | One in five spaces | Offices, retail and similar |
| Residential major renovation, more than 10 spaces after works | One per dwelling with parking | All remaining spaces | Subject to a 7% of renovation cost limit |
| Non-residential major renovation, more than 10 spaces | At least one | One in five spaces | Same cost test |
| Building with only covered parking | None required at present | Required | Under consultation |
Sources: Approved Document S FAQ, Approved Document S, Building Regulations 2010, regulation 44F and the Government consultation response on EV charging in buildings (2021).
The £3,600 cost cap
- What the cap measuresLegal requirementConnection cost only: electricity network upgrades. It does not include building work or the charge point itself.
- How many charge pointsLegal requirementThe number required is the most that can be fitted at an average of £3,600 or less each. Spaces beyond that get cable routes.
- Government example 1Official guidance10 flats with 12 spaces need 10 charge points and 2 cable routes.
- Government example 2Official guidance30 houses where the cap allows 20 charge points need 20 charge points and 10 cable routes.
Cable routes
A cable route is the ducting and access points that let a charge point be fitted later. Routes should be as straight as possible, with access points to pull cables through. A lamppost can serve as a connection point only if it is metered, or can be.
What the charge point itself must be
Charge points sold in Great Britain for private use must comply with the Electric Vehicles (Smart Charge Points) Regulations 2021. The Office for Product Safety and Standards enforces them.
- Smart functionality, including responding to signals that change charging rate or timing.
- Pre-set off-peak default charging hours the owner can accept, change or remove.
- A randomised delay function.
- Measurement of electricity used and charging time, visible to the owner.
- Cyber security consistent with ETSI EN 303 645.
- Continued charging if the network connection is lost.
Part S also sets a minimum standard for the charge point and its installation in Section 6 of the Approved Document. Check the current wording there before specifying a unit.
Planning permission
Most home chargers are permitted development, with conditions on size and position. The rules changed in May 2025 and again on 21 October 2026, when new rights for cross-pavement charging came into force. Permitted development generally applies to houses, not flats. See Planning Portal: EV charging permitted development for the current limits.
What is changing
The government published two consultations on 21 October 2026, closing 16 December 2026. They ask whether covered car parks should get charge points and not only cable routes, whether to revisit the £3,600 cap for inflation, and how tenants and leaseholders can get permission to install chargers. Nothing has changed in law yet. See the Consultation: amending the EV charging rules (closes 16 December 2026).
Recommended installer Partner
Get it installed by REX
Need Part S charge points or cable routes? REX installs EV chargers for new homes, blocks of flats, conversions and commercial sites.
Developer checklist
Common questions
Does every new home need an EV charger?
Where it has an associated parking space, usually yes, subject to the £3,600 cost cap.
What is a cable route?
Ducting and access points that let a charge point be fitted later without breaking out the ground.
Do conversions need chargers?
A material change of use to a dwelling triggers Part S where there is associated parking. Check the detail in the Approved Document.
Does Part S apply in Wales or Scotland?
No. Part S is for England. Wales is consulting on its own version, and Scotland has its own building standards.
Sources
- Approved Document S
- Approved Document S FAQ
- Building Regulations 2010, regulation 44F
- Government consultation response on EV charging in buildings (2021)
- Electric Vehicles (Smart Charge Points) Regulations 2021: guidance
- Consultation: amending the EV charging rules (closes 16 December 2026)
- Planning Portal: EV charging permitted development