From 24 March 2027, new homes in England must be designed to a new Part L that requires low-carbon heating and on-site renewable electricity. A plot keeps the old rules only if its building control application is in before that date and work starts before 24 March 2028.

Sources: Building Circular 01/2026, Approved Document L Volume 1 (2026)

Key dates

DateWhat happensSource
24 March 2026Regulations and revised Approved Documents publishedCircular 01/2026
24 March 2027Regulations come into force NextCircular 01/2026
24 September 2027Start date for higher-risk building workCircular 01/2026
24 March 2028Last day to start work on a plot protected by an earlier applicationCircular 01/2026

Many blogs say the rules apply "from 2028". The government circular gives 2027 as commencement, with 2028 as the end of the transition.

What the standard requires

  • Low-carbon heatingLegal requirement
    The notional dwelling used to set targets includes a heat pump, so gas boilers are not banned by name but will struggle to meet the targets. Heat networks with low-carbon heat are a second route.
  • On-site renewable electricity (Requirement L3)Legal requirement
    Most homes need PV equal to an array covering 40% of the ground floor area at 0.22 kWp/m².
  • Fabric and servicesLegal requirement
    Targets cover primary energy, emissions and fabric efficiency. Fabric still matters because it sets how big the heat pump and PV need to be.
  • Ventilation and overheatingOfficial guidance
    Approved Document F (ventilation) was revised alongside Part L. Part O (overheating) continues to apply.
  • Evidence at completionLegal requirement
    The as-built energy report (BREL), a measured air permeability result, commissioning records and a Home User Guide for the owner (new regulation 40C).

Transitional rules in plain English

  • Rules are applied plot by plot, not site by site.
  • A plot keeps the old rules if the initial notice, building notice or full plans application is given before 24 March 2027.
  • Work on that plot must also start before 24 March 2028.
  • Miss either condition and the new Part L applies to that plot.

Our practical advice Plots you cannot start by March 2028 should be designed to the new standard now.