The short answer
Turning an existing building into homes is a material change of use under the Building Regulations, whether it has full planning permission or uses permitted development rights such as Class MA (commercial to residential). Permitted development grants the planning permission. It does not exempt the work from the Building Regulations. Part L Section 11 sets the energy upgrades, and Part S applies where parking is provided.
Sources: Approved Document L Volume 1 (2026), Approved Document SPermitted development and the Building Regulations
- Building Regulations still applyLegal requirementA building becoming a dwelling is a material change of use. Building control must approve the energy, ventilation, fire and electrical work whatever planning route you use.
- Planning routeOfficial guidancePermitted development schemes go through prior approval rather than a full planning application. Councils use the prior approval to check the matters set out in the relevant class, so read the class conditions for your site.
- Energy statementsOur practical adviceFull planning applications for conversions are usually judged against the local plan energy policies, the same as new builds. Check with the council early whether an energy statement is needed for your route.
Part L for conversions (Section 11)
| Item | Rule |
|---|---|
| Trigger | A building becoming a dwelling counts as a material change of use |
| Renovated elements | If more than 50% of an element's surface is renovated, or more than 25% of the envelope, the whole element must meet the Table 3.3 limiting U-values |
| Windows and doors | Replacements must meet the limiting U-values: 3.30 W/m²K for windows and doors, 3.80 for rooflights |
| Heating and hot water | New or extended systems must meet the Section 4 and 5 service standards, including the 55°C flow temperature rule for new wet systems |
| Heated common areas | Follow Approved Document L Volume 2 |
Source: Approved Document L Volume 1 (2026), Section 11.
Requirement L3 (on-site solar) is written for new dwellings. Whether it applies to your conversion is one of the points we are still checking against the full Approved Document, so confirm it with building control before you price the roof.
EV charging (Part S)
A material change of use to a dwelling triggers Part S where the building has associated parking. Each dwelling with a parking space needs a charge point, within the £3,600 average connection cost cap, and cable routes apply where there are more than 10 spaces. See EV charging for the detail.
What usually applies
| Project | EV charging (Part S) | Solar (L3) | Heating | Energy statement |
|---|---|---|---|---|
| Conversion to dwellings (change of use) | Yes, if parking is provided | Check with building control | Section 11; new systems to Sections 4 and 5 | Depends on size, route and council |
| Major renovation of a residential building with more than 10 spaces | Yes, subject to the 7% cost limit | Not for existing buildings | Section 11 rules | Depends |
| Extension or loft conversion | No | No | Existing-dwelling rules | Normally no |
Recommended installer Partner
Get it installed by REX
Converting a building to flats? REX installs the heat pumps, EV chargers and solar that conversions need, sized to the building you have.
Developer checklist
Common questions
Does permitted development mean I can skip Building Regulations?
No. Permitted development only covers planning. The conversion still needs building control approval.
Do conversions need EV chargers?
Yes, where the building has associated parking. A change of use to a dwelling triggers Part S.
Does the Future Homes Standard apply to conversions?
Not in the same way as new builds. Conversions follow Section 11 of Approved Document L, which sets upgrade rules for the existing fabric and new services.