The short answer
Under the Future Homes Standard, the notional dwelling that sets each home's targets includes a heat pump, so heat pumps (or low-carbon heat networks) become the practical route for new homes from 24 March 2027. Heat pumps are not a separate legal requirement. They are how the energy targets are met. Approved Document L 2026 then sets how the system must be sized, controlled, installed and commissioned.
Sources: Approved Document L Volume 1 (2026), Approved Document L FAQWhat the Approved Document asks for
All references are to Approved Document L Volume 1, 2026.
| Topic | Requirement | Para |
|---|---|---|
| Flow temperature | New or fully replaced wet systems sized for a maximum flow temperature of 55°C | 4.10 |
| Sizing | Based on a BS EN 12831-1 heat loss calculation. The heat pump alone must meet the full design load | 4.9, 4.12 |
| Type of unit | Air source units should be inverter-driven and modulate down to mid-season load | 4.14 |
| Controls | Manufacturer controls, weather compensation or internal temperature control, a space heating timer, and room thermostatic control (with exceptions) | 4.17, 4.22, 4.23 |
| Pipework losses | Insulation to BS 5422 levels at 60°C (for example 20 mm for pipes up to 25 mm internal diameter) | 3.31, Table 3.4 |
| Cylinder losses | Standing losses within Table 3.5 (for example 1.88 kWh/24h for 150 litres) | 3.34 |
| Installer | A suitably competent installer | 8.1 |
| Certification | Self-certification by a registered competent person, or certification by a building control body | 8.2 |
| Unregistered installer | Must notify building control before work begins | 8.6 |
| Compliance certificate | Provided within 30 days | 8.5 |
| Operating information | Fixed to the unit or cylinder: design flow temperature, heat loss details, emitter circuit size, setback temperatures, and whether the commissioner is registered | 9.4 |
Commissioning
- A commissioning plan must identify what will be tested and how (para 7.3).
- A notice of completion confirms the plan was followed (para 7.4).
- The deadline is five days where a building notice or full plans are used, and 30 days in other cases such as competent person scheme work (para 7.5).
- Heat pump commissioning follows manufacturer instructions and an approved checklist, such as the one in MIS 3005-I (paras 7.10 to 7.12).
Competent person schemes and MCS
- Competent person schemesLegal requirementA registered competent person can self-certify a heat pump installation as compliant with the Building Regulations, which avoids a building control inspection. See the Competent person schemes: current list.
- MCSOfficial guidanceA separate quality and consumer-protection standard (design MIS 3005-D, installation MIS 3005-I) covering heat pumps up to 45 kW. Needed for Boiler Upgrade Scheme grants and many consumer routes, but not itself a Building Regulations requirement.
Heat pumps and London planning
The GLA Energy Monitoring Report 2024 found that 90% of developments proposed heat pumps, covering over 20,700 dwellings, with 58% of those using communal or site-wide networks. London Plan policy prioritises heat networks where they are available. See renewable energy strategies for the heating hierarchy.
Planning permission and noise
Permitted development rights for air source heat pumps on existing homes changed on 29 May 2025:
- The size limit rose from 0.6 m³ to 1.5 m³.
- Detached houses can have two heat pumps instead of one.
- The rule against siting within 1 m of the boundary was removed.
- Units that also provide cooling are allowed, which supports air-to-air models.
- Listed buildings are still restricted.
Noise is assessed with the MCS planning standard (now MCS 020 a), at the nearest neighbouring habitable room window or door. Check the current limit in the standard before relying on a figure.
New-build schemes get heat pumps approved through the planning application, so noise is usually assessed as part of that.
Sources: The 2025 permitted development amendment order (heat pumps), CIBSE Journal: new planning rules for heat pumps.
Grants and VAT
- Boiler Upgrade SchemeOfficial guidanceNew builds are not eligible, except self-builds. The grant is £7,500 for air-to-water and ground source heat pumps and £2,500 for air-to-air units (values from 28 April 2026). Check the Boiler Upgrade Scheme: grant categories and values for later changes.
- VATLegal requirementInstallation in existing homes is zero-rated until 31 March 2027, then 5%. Energy-saving materials installed while building a new dwelling are already zero-rated.
- ConnectionsOfficial guidanceA heat pump adds load to the supply. DNOs have a notify-or-apply process, including a joint form for heat pumps and EV chargers installed together. See grid connections.
Recommended installer Partner
Get it installed by REX
Need heat pumps fitted across your plots? REX installs air source heat pumps for new homes, conversions and renovations.
Developer checklist
Common questions
Do all new homes need a heat pump?
Not by name. The energy targets are written around one, so it is the usual route. A low-carbon heat network is the main alternative.
Does a heat pump need MCS?
Not for the Building Regulations. Yes for grants and many consumer protections.
Do I need planning permission for a heat pump?
Usually not on existing houses, within the permitted development limits. New-build schemes follow their planning approval.
Sources
- Approved Document L Volume 1 (2026)
- Approved Document L FAQ
- Competent person schemes: current list
- MCS
- The 2025 permitted development amendment order (heat pumps)
- CIBSE Journal: new planning rules for heat pumps
- Boiler Upgrade Scheme: grant categories and values
- Boiler Upgrade Scheme: eligibility
- VAT Notice 708/6: energy-saving materials
- GLA Energy Monitoring Report 2024