Home / Topics / Heat pumps

Heat pump requirements

Rules current as of 22 November 2026Change log

The short answer

Under the Future Homes Standard, the notional dwelling that sets each home's targets includes a heat pump, so heat pumps (or low-carbon heat networks) become the practical route for new homes from 24 March 2027. Heat pumps are not a separate legal requirement. They are how the energy targets are met. Approved Document L 2026 then sets how the system must be sized, controlled, installed and commissioned.

Sources: Approved Document L Volume 1 (2026), Approved Document L FAQ

What the Approved Document asks for

All references are to Approved Document L Volume 1, 2026.

TopicRequirementPara
Flow temperatureNew or fully replaced wet systems sized for a maximum flow temperature of 55°C4.10
SizingBased on a BS EN 12831-1 heat loss calculation. The heat pump alone must meet the full design load4.9, 4.12
Type of unitAir source units should be inverter-driven and modulate down to mid-season load4.14
ControlsManufacturer controls, weather compensation or internal temperature control, a space heating timer, and room thermostatic control (with exceptions)4.17, 4.22, 4.23
Pipework lossesInsulation to BS 5422 levels at 60°C (for example 20 mm for pipes up to 25 mm internal diameter)3.31, Table 3.4
Cylinder lossesStanding losses within Table 3.5 (for example 1.88 kWh/24h for 150 litres)3.34
InstallerA suitably competent installer8.1
CertificationSelf-certification by a registered competent person, or certification by a building control body8.2
Unregistered installerMust notify building control before work begins8.6
Compliance certificateProvided within 30 days8.5
Operating informationFixed to the unit or cylinder: design flow temperature, heat loss details, emitter circuit size, setback temperatures, and whether the commissioner is registered9.4

Commissioning

  • A commissioning plan must identify what will be tested and how (para 7.3).
  • A notice of completion confirms the plan was followed (para 7.4).
  • The deadline is five days where a building notice or full plans are used, and 30 days in other cases such as competent person scheme work (para 7.5).
  • Heat pump commissioning follows manufacturer instructions and an approved checklist, such as the one in MIS 3005-I (paras 7.10 to 7.12).

Competent person schemes and MCS

  • Competent person schemesLegal requirement
    A registered competent person can self-certify a heat pump installation as compliant with the Building Regulations, which avoids a building control inspection. See the Competent person schemes: current list.
  • MCSOfficial guidance
    A separate quality and consumer-protection standard (design MIS 3005-D, installation MIS 3005-I) covering heat pumps up to 45 kW. Needed for Boiler Upgrade Scheme grants and many consumer routes, but not itself a Building Regulations requirement.

Heat pumps and London planning

The GLA Energy Monitoring Report 2024 found that 90% of developments proposed heat pumps, covering over 20,700 dwellings, with 58% of those using communal or site-wide networks. London Plan policy prioritises heat networks where they are available. See renewable energy strategies for the heating hierarchy.

Planning permission and noise

Permitted development rights for air source heat pumps on existing homes changed on 29 May 2025:

  • The size limit rose from 0.6 m³ to 1.5 m³.
  • Detached houses can have two heat pumps instead of one.
  • The rule against siting within 1 m of the boundary was removed.
  • Units that also provide cooling are allowed, which supports air-to-air models.
  • Listed buildings are still restricted.

Noise is assessed with the MCS planning standard (now MCS 020 a), at the nearest neighbouring habitable room window or door. Check the current limit in the standard before relying on a figure.

New-build schemes get heat pumps approved through the planning application, so noise is usually assessed as part of that.

Sources: The 2025 permitted development amendment order (heat pumps), CIBSE Journal: new planning rules for heat pumps.

Grants and VAT

  • Boiler Upgrade SchemeOfficial guidance
    New builds are not eligible, except self-builds. The grant is £7,500 for air-to-water and ground source heat pumps and £2,500 for air-to-air units (values from 28 April 2026). Check the Boiler Upgrade Scheme: grant categories and values for later changes.
  • VATLegal requirement
    Installation in existing homes is zero-rated until 31 March 2027, then 5%. Energy-saving materials installed while building a new dwelling are already zero-rated.
  • ConnectionsOfficial guidance
    A heat pump adds load to the supply. DNOs have a notify-or-apply process, including a joint form for heat pumps and EV chargers installed together. See grid connections.

Recommended installer Partner

Get it installed by REX

Need heat pumps fitted across your plots? REX installs air source heat pumps for new homes, conversions and renovations.

Get a quote from REX

Developer checklist

Common questions

Do all new homes need a heat pump?

Not by name. The energy targets are written around one, so it is the usual route. A low-carbon heat network is the main alternative.

Does a heat pump need MCS?

Not for the Building Regulations. Yes for grants and many consumer protections.

Do I need planning permission for a heat pump?

Usually not on existing houses, within the permitted development limits. New-build schemes follow their planning approval.

Sources