Home / Topics / Solar PV and batteries

Solar PV and batteries (Requirement L3)

Rules current as of 22 November 2026Change log

The short answer

From 24 March 2027, a new dwelling must have an on-site renewable electricity system under new Requirement L3. The default size is a reference array of 0.22 kWp per m² covering 40% of the ground floor area. If the roof cannot take that, the design must maximise output, and the evidence goes to building control. Batteries are not required.

Sources: Approved Document L Volume 1 (2026), Approved Document L FAQ

How the L3 size is worked out

The rules are in Approved Document L Volume 1 (2026), Section 5, with worked layouts in Appendix B.

ItemRuleReference
Reference array0.22 kWp per m² over an area equal to 40% of the ground floor areaPara 5.73a
Sizing formulaPV output = PV area (at least 40% of ground floor) × efficiency (at least 0.22 kWp/m²)Equation 5.1
Reference orientationSouth-east to south-west, 45° pitch, unshadedPara 5.73a
Alternative testAnnual output equal to an array covering the "reasonably practicable roof area" at 0.22 kWp/m²Para 5.73b
If the standard cannot be metMaximise output, for example with higher-efficiency panels or different orientationsPara 5.76
Minimum shortfall thresholdA shortfall is allowed where the roof cannot produce 720 kWh a year (houses)Para 5.77
ReportingNon-compliant arrays are flagged in the as-built (BREL) report with evidencePara 5.78

Output is calculated, not just area. The method uses the SAP 10.3 approach in Appendix M1, so orientation and shading affect the result. Panel efficiency is peak output divided by the whole panel area, including the frame.

When L3 does not apply

The requirement does not apply where the building is a relevant building under regulation 7(4), where a system is not possible because of the design or surroundings, or where equivalent output comes from an off-site system serving the residents.

Our practical advice Treat these as exceptions you have to evidence, not ones you can assume.

What building control will want to see

Where output is below the reference standard, Appendix B asks for:

  • Roof diagrams with and without PV.
  • A statement explaining the lower provision.
  • Calculations signed by a suitably qualified person, such as an On Construction Domestic Energy Assessor.
  • The maximum capacity (kWp) and annual generation (kWh) possible for the roof layout and orientation.

Roof layout rules of thumb

Appendix B uses these offsets to size the usable roof area. They are guidance, not meant to cover every case.

OffsetDistance
From the ridge or top of the pitch600 mm
From the roof edge500 mm
From the centre line of a party wall750 mm
From windows or doors500 mm
Maintenance access from an unprotected edge2,000 mm, or 300 mm with a man-safe system or railings

Worked examples in the document: a hipped roof with a 16 m² array gives 3.52 kWp, and a mid-terrace with dormers and an 8 m² array gives 1.76 kWp.

Questions developers ask

  • Detached garagesOfficial guidance
    The garage roof does not count towards the dwelling's roof area, and the garage floor is excluded from the 40% calculation. Panels on a garage in the curtilage can still be used to meet L3.
  • North-facing or shaded roofsOfficial guidance
    Unlikely to be excluded on that basis alone, because the calculation already accounts for orientation and shading.
  • Blocks of flatsLegal requirement
    Paragraph 5.74 sets the output for buildings with several dwellings. Read it before designing a block.
  • Grid limitsLegal requirement
    Requirement L2 still applies: the system must be sized for the site and infrastructure, which can include DNO export limits. See grid connections.
  • BatteriesOfficial guidance
    Not required by L3. If fitted, they fall under Approved Document P, and MCS covers electrical storage up to 50 kW.

Planning permission

For houses and flats, permitted development rights changed on 27 August 2026. Until 27 August 2027 you can use either the old or the new rules.

ConditionHouses (from 27 Aug 2026)Blocks of flats
Roof panels (pitched)No more than 200 mm from the roof slopeSame
Wall, balcony or enclosure facing a highwayNo more than 0.2 mNo separate rule
Elsewhere on a wall or balconyNo more than 0.4 mNo separate rule
Flat roofNo more than 600 mm above the highest partSame
Listed buildings and scheduled monumentsNot permittedSame
Conservation areasNo panels on a wall, balcony or enclosure facing a highwayNo panels on a wall facing a highway
Plug-in solarNew rights; not on timber walls, balconies or timber-clad exteriorsSame

Source: Planning Portal: solar equipment on houses and flats. New homes also need the solar shown in the planning approval, and London schemes follow the London Plan energy rules (see renewable energy strategies).

Export payments, certification and VAT

Smart Export Guarantee payments go to the homeowner once the system is registered. Licensed suppliers must offer an export tariff, and an installation certificate such as MCS is normally needed. The zero rate of VAT for installing solar in existing homes ends on 31 March 2027, after which the reduced 5% rate applies. Energy-saving materials installed while building a new dwelling are already zero-rated.

Recommended installer Partner

Get it installed by REX

Need an L3 array designed and fitted? REX installs solar PV and batteries on new homes and blocks of flats.

Get a quote from REX

Developer checklist

Common questions

Does every new home need solar panels?

From 24 March 2027, most do under Requirement L3, unless an exception applies and is evidenced. Plots protected by the transitional rules follow the old Part L.

Do new homes need a battery?

No. Batteries are optional. If fitted, they must meet the electrical rules.

Can a north-facing roof get out of the requirement?

Not on its own. Orientation is already part of the calculation, so the design must maximise what the roof can produce.

Sources